简体 English
返回

2016年2月

  • Categories:发展历程
  • Author:
  • Origin:
  • Time of issue:2021-10-20 11:31
  • Views:

(Summary description)被三门县人民政府评为“县重点工业企业”; 三项通过“浙江联政科技评估中心”鉴定处国内领先水平

2016年2月

(Summary description)被三门县人民政府评为“县重点工业企业”;
三项通过“浙江联政科技评估中心”鉴定处国内领先水平

  • Categories:发展历程
  • Author:
  • Origin:
  • Time of issue:2021-10-20 11:31
  • Views:

被三门县人民政府评为“县重点工业企业”;
三项通过“浙江联政科技评估中心”鉴定处国内领先水平

Recommended

Jinan Siemens Hydropower Station, Venezuela.
Jinan Siemens Hydropower Station, Venezuela.
Our YSDGL350 forced air cooled oil cooler and electrical isolation technology with insulation value of 51GΩ under 2.5kV are used in 750kW UHV transformer.
105MVA Sukiknari Hydropower Station, Pakistan
105MVA Sukiknari Hydropower Station, Pakistan
Our YSFS-200X3 forced water cooled oil cooler is used on dual-loop control for single-phase 525/18kV boosting transformer.
Onshore Wind Power Farm
Onshore Wind Power Farm
Our air cooled air coolers and water cooled air coolers for 5.5MW, 6.0MW and 8MW wind turbine generator are applied in plenty of onshore wind power farms around world.
language
中国
韩国
韩国
韩国
韩国
韩国

CONTACT US

E-mail:sales@erg.cn

Copyright ©zhejiang erg technology Inc. 浙ICP备2021031831号-1 Powered by 300.cn